Home Company An Engineering-Led Injection Molding Partner Since 2002

C.K.MOLD & ENGINEERING LIMITED

An Engineering-Led Injection Molding Partner Since 2002

CKMOLD is the trading name used by C.K.MOLD & ENGINEERING LIMITED for custom injection mold and molded-part projects. The Shenzhen office coordinates commercial and overseas communication; manufacturing resources in Dongguan support tooling, trials and production execution.

The company’s role is practical: turn approved product requirements into a buildable mold, validate the process with samples, and maintain a clear record of decisions for customers managing projects from outside China.

  • Legal company identity shown clearly
  • Engineering approvals before irreversible work
  • Certification scopes presented without expansion

2002

Operations established around injection mold projects

Shenzhen

Commercial coordination and customer communication

Dongguan

Tooling, trial and molding production resources

Documented

DFM, design, trial and approval decisions

Reviewed by CKMOLD project engineering • Last updated August 2026

VERIFIABLE MILESTONES

A Timeline Built From Existing Company and Certificate Records

Only dates supported by the current website or certificate images are shown. Marketing milestones without source evidence have been left out.

2002

CKMOLD operations begin

The company positions its experience from 2002 in injection mold engineering, toolmaking and molded-part project support.

2022

ISO 9001 original certificate issue

The current ISO 9001 certificate records 31 October 2022 as the original certificate issue date for injection molds and injection molded plastic parts.

2023

ISO 14001 original certificate issue

The environmental management certificate records 25 November 2023 as its original issue date for activities related to injection molds and injection molded plastic parts.

2025

Scope-specific quality certificates

The ISO 13485 certificate is limited to plastic housings for infrared thermometers. The IATF 16949 certificate covers injection molded plastic parts and explicitly excludes product design under clause 8.3.

Today

Tooling and production project support

CKMOLD coordinates design review, mold construction, trials, production preparation and export communication according to each approved project scope.

HOW THE LOCATIONS WORK TOGETHER

Shenzhen Coordination, Dongguan Manufacturing Resources

The Shenzhen address is the company contact point shown on current certificates and used for project communication. Dongguan manufacturing resources support the physical work required for mold making, fitting, trials and injection molding.

For an overseas buyer, the important point is not a large location claim; it is the handoff. Commercial assumptions, CAD revisions, tool decisions, sample feedback and shipment requirements are kept under the same project conversation so production work is not disconnected from customer approval.

  • Quotation questions consolidated before commitment
  • Engineering revisions tracked against approved files
  • Trial feedback returned with photos, samples or reports as agreed
RESPONSIBILITY BY ROLE

Who Owns Each Part of the Project Conversation

CKMOLD does not publish invented biographies or headcounts. The useful distinction for buyers is responsibility: who clarifies the RFQ, who approves engineering, who manages the tool and who releases parts.

Project / Quotation Engineering

Reviews files, quantities, material, finish, tolerances and commercial assumptions; records what is included, excluded or still open.

Mold Engineering

Develops the DFM and mold concept, controls revisions, and resolves gate, cooling, ejection, steel and machine-interface decisions.

Toolroom and Trial Team

Machines, fits, assembles and tests the mold; records trial conditions and completes approved corrections.

Quality and Production

Translates approval requirements into incoming checks, sample reports, production inspection, cavity identity and shipment release.

OPERATING MODEL

Two Deliverables, Two Different Handover Points

Mold + Parts Program

CKMOLD retains the approved tool for trials and production unless the commercial agreement says otherwise. Process setup, part inspection, secondary work and repeat orders become part of the continuing program.

  • Approval sample defines the production reference
  • Tool maintenance connects to part performance
  • Production changes require controlled review

Export Mold Program

The tool is designed for the destination molder. Machine compatibility, component standards, documentation, spare parts, preservation and release condition are defined before the mold leaves China.

  • Destination interfaces are an engineering input
  • T0/T1 and final acceptance are recorded
  • Handover includes agreed files and packing
QUALITY CULTURE

Approval Happens Before Costly Work Moves Forward

A project is controlled by visible release points rather than assumptions buried in email threads.

01

Requirement Basis

Record the file revision, resin, quantities, finish, dimensions, function and destination that the quotation assumes.

02

DFM / Design Release

Resolve mandatory geometry or mold-architecture issues before steel and major components are committed.

03

Sample Disposition

Classify feedback as approve, correct, investigate or retrial, with the next action and file revision visible.

04

Shipment / Production Release

Confirm agreed documents, samples, protection, packaging and ownership details before parts or tooling leave control.

CERTIFICATES AND EXACT SCOPE

Current Certificate Information

The summaries below follow the visible certificate text. A certificate supports the stated management-system scope; it is not a blanket product approval, cleanroom claim or regulatory authorization.

ISO 9001:2015

Certificate holder as printed: C.K.MOLD&ENGINEERING LIMITED. Issuer: United Registrar of Systems (URS). Certificate no. 106631/A/0001/UK/En. Expiry: 30 October 2028.

  • Scope: Manufacture of Injection Molds; Manufacture of Injection Molded Plastic Parts
  • Original certificate issue date: 31 October 2022
  • Current issue date shown: 06 November 2025

ISO 14001:2015

Certificate holder as printed: C.K.MOLD&ENGINEERING LIMITED. Issuer: United Registrar of Systems (URS). Certificate no. 106631/C/0001/UK/En. Expiry: 24 November 2026.

  • Scope: Environmental Management Activities related Manufacture of Injection Molds; Manufacture of Injection Molded Plastic Parts
  • Original and current issue date shown: 25 November 2023
  • The certificate must be replaced on this page after renewal

ISO 13485:2016

Certificate holder as printed: C.K.MOLD&ENGINEERING LIMITED. Issuer: United Registrar of Systems (URS). Certificate no. 142945/A/0001/UK/En. Expiry: 28 September 2028.

  • Scope is limited to Manufacture of Plastic Housings for Infrared Thermometers
  • Original and current issue date shown: 29 September 2025
  • This does not represent approval for every medical product or a finished medical device

IATF 16949:2016

Certificate holder as printed: C.K.MOLD&ENGINEERING LIMITED. Issuer: United Registrar of Systems (URS). Certificate no. 137338/A/0001/SM/En. USI no. TNX542. Expiry: 30 January 2028.

  • Scope: Manufacture of Injection Molded Plastic Parts
  • Product Design is excluded under clause 8.3
  • Original and current issue date shown: 31 January 2025
OVERSEAS PROJECT MANAGEMENT

What Remote Buyers Should Expect to See

A Written Basis

Quotation assumptions, approved CAD revision, mold ownership, destination, material and sample requirements stay identifiable.

Decision-Ready Updates

Photos or progress notes should explain what changed, why it changed, what is confirmed and what still requires approval.

A Controlled Handover

Production release or export shipment includes the agreed samples, documents, protection, labeling and follow-up path.

Evaluate CKMOLD Against Your Actual Project Requirements

Share the files and approval expectations that will determine whether the project is a practical fit. CKMOLD will identify missing inputs and the appropriate next engineering step.

Start with the Project Basics

Use this short form for a general inquiry. For CAD upload, quantities and quality requirements, use the full RFQ page.

Wait, We Have Something Special for You!

Join our mailing list and receive a 10% discount on your next mold or CNC project.