A supplier’s quote lands on your desk. The tooling price looks fair, the part price works — and then you notice a line you cannot judge: "Machine: 350T." Is 350 tons right for your part, or is it a guess that will cost you flash, a cracked mold, or an inflated part price?
Clamping force is the force that holds the mold shut against the pressure of the molten plastic trying to push it open. It is calculated from your part, not from the machine catalogue: multiply the total projected area of the part, all cavities and the runner by a tonnage factor for your resin — usually 2 to 5 tons per square inch — then add about 15% as a safety margin. Too little tonnage lets the mold open a fraction of a millimetre and flash appears; too much crushes vents, rolls the parting line and shortens mold life. This guide works the calculation on a real example, shows how to read the tonnage line in a quote, and lists the three machine checks buyers forget.
What Clamping Force Actually Holds Back
When molten plastic is injected into a closed mold, it does not sit quietly. Injection pressure pushes in every direction at once — against the cavity walls, against the core, and, most importantly for this question, against the parting line, trying to force the two mold halves apart. Clamping force is the counter-force: the press squeezes the mold shut with enough force to resist that opening push for the whole fill and pack cycle.
The tonnage printed on a machine — 150T, 350T, 1200T — is the maximum clamping force that machine can apply. It is a capacity, not a setting. A 350-ton press can hold a mold shut with up to 350 tons of force, but the job itself may only need 175. The number that matters for your part is the force the job actually requires, and that number comes from two things only: how much area the pressure acts on, and how high that pressure runs.
The area is the projected area: the flat "shadow" of everything that fills with plastic, seen looking straight along the direction the mold opens. A part 150 mm long and 100 mm wide casts a shadow of about 23 square inches on the parting plane, whatever its curves and ribs look like in three dimensions. Only that shadow counts, because only pressure acting on that shadow can push the mold open. Pressure acting on vertical walls pushes sideways, not apart.
The pressure is the cavity pressure — the pressure inside the mold while it fills and packs — and it depends on the resin, the wall thickness and how far the melt has to flow. An easy-flowing polypropylene in a thick-walled part may need only 2 tons of clamp force per square inch of shadow. A glass-filled nylon in a thin-walled part with a long flow path may need 5. That is why two parts of the same size can need machines of very different tonnage, and why a tonnage figure without the calculation behind it tells you nothing.
One conversion is worth keeping in your pocket: one ton per square inch equals 2,000 psi, or about 138 bar. So a tonnage factor of 3 tons per square inch means an average cavity pressure of roughly 6,000 psi, or about 414 bar. When a supplier talks about cavity pressure and another talks about tons per square inch, they are describing the same thing in different units.
The Calculation in Four Steps
You do not need simulation software to get a useful first estimate. The projected-area method below is the one molding trainers at RJG teach, and it is the same method behind the tonnage lines in most supplier quotes. It gives a planning estimate, not a final process setting — the exact number is confirmed at mold trial, when cavity pressure is actually measured. But it is accurate enough to judge whether a quote’s machine makes sense, and to catch the two expensive mistakes: a press far too small, and a press far too large.
Step 1: Measure the projected area
Take the part’s outline as seen from the injection direction — length times width for a rectangle, π × radius² for a round part — and subtract any area that is cored out through the part, such as a through-hole that the core shuts off. Then multiply by the number of cavities, and add the projected area of the cold runner and sprue. A hot-runner mold has no cold runner, so it adds nothing; that alone is one reason hot-runner tools often run on smaller presses than cold-runner tools of the same cavitation.
The classic mistake at this step is forgetting the runner. A runner system can easily add 10 to 20 percent to the total area, and a calculation that leaves it out is a calculation that will flash at trial. Count every cavity, count the runner, and count the sprue.
Step 2: Pick a tonnage factor for the resin
| The tonnage factor is the clamp force needed per square inch of projected area. Published guides put the range at about 2 to 10 tons per square inch, with 3 as the usual starting point. The table below gives planning ranges by resin family, compiled from RJG’s published guidance and Kaysun’s tonnage guide. Treat them as starting points for a quote check, not as material specifications — the resin supplier’s data sheet and a mold-filling simulation are the authoritative sources for a specific part. | Resin family | Typical tonnage factor (tons/in²) | What pushes it up |
|---|---|---|---|
| PP, PE, PS (easy flow) | 2–3 | Thin walls, long flow | |
| ABS, SAN | 2.5–3.5 | Glass fill, texture | |
| Nylon, unfilled | 2.5–3.5 | Moisture, long flow | |
| PC | 3–4 | Thin wall, high gloss | |
| POM (acetal) | 3–4 | Tight tolerances | |
| PC/ABS blend | 3–4 | Thin wall | |
| Glass-filled grades (30%) | 4–5 | High fill, long flow | |
| Thin wall (under 1.5 mm) or flow length over 150× wall | 5–8 | Very high injection pressure |
Step 3: Multiply, then add a safety margin
Clamping force = total projected area × tonnage factor × safety factor. The safety factor is usually 1.10 to 1.20 — Kaysun recommends about 15% on top of a mold-filling analysis, because the analysis often reports fill pressure only and the higher packing pressure still has to be held back. The margin also covers the normal variation between resin lots and the difference between a calculated estimate and a real cavity.
Step 4: Round up to a standard press size
Machines come in standard tonnage classes — 100, 150, 200, 250, 350, 450 tons and so on — so round up to the next available size. A good rule from mold-filling guidance is to keep the calculated requirement at roughly 70 to 85% of the press rating, which leaves headroom for packing pressure without parking the job on a press far larger than it needs. CKMOLD’s in-house injection molding capacity runs up to 1200T, so the full range from small precision parts to large multi-cavity tools is covered in-house.
Worked example: an enclosure cover in ABS
Take a rectangular enclosure cover, 150 × 100 mm, with a 2.5 mm wall, molded in ABS. This is a deliberately ordinary part — the kind of cover that appears on housings, control boxes and small appliances — so the numbers transfer easily to your own part.
| Step | Calculation | Result |
|---|---|---|
| Projected area, one cavity | 150 mm × 100 mm = 5.91 in × 3.94 in | 23.3 in² |
| Two cavities | 23.3 in² × 2 | 46.5 in² |
| Add cold runner | 46.5 in² + 4.0 in² | 50.5 in² |
| Base clamp force (ABS, 3 tons/in²) | 50.5 in² × 3 | 151.5 tons |
| Add 15% safety margin | 151.5 × 1.15 | 174.2 tons |
| Press to quote | Round up to the next standard size | 200-ton press |
Two variations show how quickly the answer moves. Double the cavitation to four cavities and the total area becomes 97.0 in², the base force 291 tons, and with the same 15% margin the requirement is about 335 tons — a 350-ton press. Change nothing but the resin, molding the same two-cavity cover in polycarbonate at a factor of 4.5 instead of 3, and the requirement rises to about 261 tons, which needs a 280- or 300-ton press. The part never changed size. The machine did.
These are illustrative planning figures, worked from published tonnage factors — not a quotation and not a promise about any specific part. Your part’s real number depends on its exact geometry, gate design and resin grade, and it is confirmed by mold-filling simulation or at T1. But the example shows the structure of the decision: area first, resin second, margin third, press size last.
RJG’s own published example makes the same point at larger scale. A square leftover-dish lid, 4.6 × 4.6 inches, in an eight-cavity hot-runner mold: 21.16 in² per cavity, 169.28 in² in total, and at 3 tons per square inch the starting calculation is 507.84 tons. RJG then adjusts for the low-viscosity LDPE, the short flow length and the small gate, and concludes the expected range is 339 to 508 tons, with 420 tons as a good starting point. The rule of thumb gives you the neighbourhood; the part’s details pick the street.
What Pushes the Number Up or Down
The tonnage factor is not a property of the resin alone. Five things move it, and a supplier who quotes tonnage without mentioning them is quoting from habit.
Wall thickness and flow length. The ratio of flow length to wall thickness — how far the melt must travel, divided by how thin the channel is — is the strongest single driver. RJG’s guidance is that a ratio below 150:1 carries a low risk of sinks, short shots or dimensional trouble, and needs less pressure to pack. Above that, injection pressure climbs steeply, and so does the tonnage factor. A thin-walled part with a long flow path is the classic case where the 3-tons-per-square-inch starting point is far too low.
Resin viscosity. A high melt-flow grade of a resin needs less pressure to pack than a low-flow grade of the same resin. But compare only within one resin family: melt-flow index is measured differently for every resin type, so an MFI of 10 for polypropylene says nothing about the molding viscosity of a polycarbonate with the same number. Polycarbonate is always a high-viscosity molding resin, whatever its MFI says.
Glass fill and additives. Glass fibre raises viscosity and raises the pressure needed to fill and pack. A 30% glass-filled grade typically sits a full ton or more per square inch above its unfilled equivalent. Flame retardants and mineral fillers push in the same direction.
Gate size, gate count and gate location. A larger gate, or more gates, gives the melt a wider path into the cavity and lowers the pressure the injection unit must apply — which lowers the clamp force needed to hold the mold shut. Gate location matters too: a gate placed so the melt travels the shortest path to the farthest point of the part needs less pressure than a gate that forces a long, thin flow. This is one of the decisions a DFM review checks before steel is cut, because moving a gate after the mold is built is expensive and sometimes impossible.
Melt and mold temperature. Running the melt and the mold at the warm end of the resin’s recommended window lowers viscosity and eases filling, which can drop the required tonnage by a meaningful amount — at the cost of a second or two of cooling time. It is a trade, not a free win, and it only works inside the resin supplier’s stated window. One process change can move the number the other way: gas-assisted injection molding packs the part from inside with nitrogen gas, so the press needs less clamp tonnage to hold the mold shut.
How to Read the Tonnage Line in a Supplier Quote
Most quotes state a machine size and stop there. That is not enough to judge. Ask the supplier to show the three numbers behind it: the total projected area they used, the tonnage factor they applied, and the safety margin they added. A supplier that can state those three numbers has calculated the machine; a supplier that cannot is guessing, and the guess usually goes in one of two expensive directions.
| What the quote shows | What it usually means | What to ask |
|---|---|---|
| A tonnage number, no calculation | The machine was picked by habit or by availability | "What projected area and factor did you use?" |
| Tonnage set at the machine’s maximum | The press is being run flat out; no headroom for packing | "What is the calculated requirement, and what percentage of the press is that?" |
| A wide range, e.g. 550–750 tons for one tool | The low end may have been used to win the job | "If the optimum is mid-range, what machine will the parts actually run on?" |
| Tonnage far above your own estimate | Overclamping: higher machine rate, shorter mold life | "What factor and safety margin justify this size?" |
| Tonnage exactly matching a free machine | The schedule chose the press, not the part | "Would this tool run on the next size down?" |
| No machine stated at all | Tonnage was never checked | "Which press, and what is its rated tonnage?" |
Kaysun’s warning is worth remembering here: a tonnage calculation is often presented as a range, and a molder can save money by buying the smaller machine at the bottom of the range and claiming it will do the job. If the true optimum sits in the middle or upper part of that range, the parts will flash. The quote that wins on price by quoting the smallest machine in a wide range is the quote most likely to produce flash at T1.
There is also a cost logic buyers should understand. A molder sells machine time, not parts, and part cost should be based on the smallest machine the mold can ideally run on. If your tool needs a 200-ton press but the supplier only has a 350-ton free, the honest quote prices the part on the 200-ton rate and absorbs the difference — or tells you so. A quote that silently prices a small part on a large press is charging you for tonnage you never needed.
Three Machine-Fit Checks Tonnage Alone Misses
Tonnage is the last of four machine checks, not the only one. A press can have exactly the right tonnage and still be the wrong machine, and these three checks are the ones buyers most often leave until the mold arrives.
Shot size. The total shot — part weight times cavities, plus runner — should use roughly 25% to 65% of the machine’s rated barrel capacity. Below 25%, the plastic sits in the barrel too long and degrades; above 65%, shot-to-shot consistency suffers because the screw has too little room to plasticize evenly. A mold that needs a large shot may have to go into a bigger press purely for its barrel, even when the tonnage calculation says a smaller one would do.
Mold fit. The mold must pass between the tie bars and sit inside the platen, with room to install and remove it. A wide multi-cavity tool can fail this check on a press whose tonnage is ample. Stack height matters too: the closed mold must fit within the machine’s minimum and maximum daylight, and the opening stroke must be long enough for the part to clear the mold — tall parts, three-plate molds and stack molds are the usual surprises here.
Ejector stroke. If the mold needs 5 inches of ejector stroke to push the part clear and the machine only has 4, the part will not eject cleanly however correct the tonnage is. A stripper-plate design or robotic removal can sometimes solve it, but that is a mold change, not a machine setting.
Ask for all three numbers in writing — clamp force, shot weight as a percentage of barrel capacity, and tie-bar spacing against your mold size. If a supplier cannot provide them for the machine assigned to your mold, the quotation is built on assumption rather than calculation.
When the Number Is Wrong: What the Parts Tell You
Tonnage errors announce themselves on the parts, and the symptom tells you which direction the error went. Read the parts before you blame the machine.
| Symptom on the part | Most likely direction | First check |
|---|---|---|
| Flash on the parting line or vents | Too little clamp force | Measure the actual cavity pressure; check the parting line and venting before moving to a bigger press |
| Variable part size or weight, shot to shot | Too little clamp force | Check whether the mold is opening slightly under pack pressure |
| Burns, short shots, gloss changes | Too much clamp force narrowing the process window | Reduce the set tonnage toward the calculated requirement |
| Crushed vents, rolled parting line | Too much clamp force over time | Inspect the parting line and vent depths |
| Cracked core or cavity block | Gross overclamping | Stop the job; the mold needs repair, not adjustment |
The flash row deserves a caution. When a new mold flashes at T1, the instinct is to move it to a bigger press. Do the cheaper checks first: a pressure-loss study will show whether the nozzle, sprue, runner or gates are too restrictive, and whether the parting line is relieved and the vents are ground to the right depth. A mold that flashes because its gates are too small will flash on a bigger press too — it will just flash more expensively.
Overclamping is the quieter failure, and RJG’s published cases show how expensive quiet can be. In one, a mold that needed roughly 100 tons was clamped at 400 — four times the requirement — and the cavity block split in two places, each split running the full depth of the block. Replacing it cost upwards of $100,000 in expediting alone. In another, a mold needing about 10 tons was set to 100 tons on a vertical press whose mold base covered less than two-thirds of the platen; over years the frame rails fractured, and the total cost including labour and scrap passed $200,000. Both failures came from the same habit: setting the clamp to the machine maximum because more felt safer. It is not safer. It is a different way to break things.
What to Put in Your RFQ
A tonnage check needs information from you before the supplier can calculate anything. Put these ten items in the RFQ, and the tonnage line in the reply becomes something you can actually judge.
- The part files. A STEP file and a 2D drawing with the key dimensions, so the supplier can measure the projected area rather than guess it.
- Resin grade and melt-flow rate. The exact grade, not just "ABS" — the grade sets the viscosity and the tonnage factor.
- Wall thickness and longest flow length. The two numbers that set the flow-length-to-wall ratio, and with it the pressure the part needs.
- Cavity count — and a second scenario. Ask for two cavitation options if your annual volume is uncertain; doubling the cavities roughly doubles the tonnage, and the cheapest tool is not always the cheapest part. Our order-quantity guide works through how batch size and repeat orders change that decision.
- Runner type. Hot runner or cold runner — it changes the projected area and the press size.
- Gate preference, or "supplier to propose." If you have a cosmetic surface that must stay gate-free, say so now.
- The calculation, in the reply. Ask the supplier to state the projected area, the tonnage factor, the safety margin and the press assigned — in writing.
- Shot size as a percentage of barrel capacity. Confirm the shot sits inside the 25–65% window on the assigned press.
- Mold fit confirmation. Tie-bar spacing, platen size and daylight against your mold’s outside dimensions.
- What happens if T1 flashes. Agree in advance who pays for the fix — a process change, a gate change, or a move to a larger press — so a tonnage surprise does not become a commercial dispute.
Tonnage also interacts with tolerances: packing pressure is what holds dimensions, and packing pressure is what the clamp must resist. If your drawing carries tight tolerances on a dimension that depends on packing, say so in the RFQ — it is a reason the supplier may need a larger press, or a better-controlled process, and it is cheaper to discuss before the mold is built than after the first articles measure out of tolerance.
FAQ
Is a bigger tonnage always safer?
No. Too little tonnage causes flash and dimensional variation; too much crushes vents, rolls the parting line, breaks inserts and can crack the mold or even the machine frame. RJG’s published cases include a cavity block split by four times the required tonnage and a press frame broken by ten times the required tonnage. The safe number is the calculated number, with a 10–20% margin — not the machine maximum.
Does adding cavities always mean a bigger machine?
Almost always, because each cavity adds its projected area to the total. Doubling from two cavities to four roughly doubles the clamp force required, as the worked example above shows: the same cover goes from a 200-ton press to a 350-ton press. Whether the part price still falls depends on whether the larger machine rate wipes out the saving from fewer cycles — which is why it is worth quoting two cavitation scenarios.
Can I just use 3 tons per square inch?
As a starting point, yes — it is the figure RJG recommends when nothing else is known. As a final answer, no. Wall thickness, flow length and resin type are the three variables that decide whether the true factor is below or above 3, and a thin-walled, long-flow, glass-filled part can need double that. A mold-filling simulation, or the resin supplier’s flow-length chart, replaces the rule of thumb with a number for your part.
What if my supplier will not show the calculation?
Ask once, plainly, for the projected area, the factor and the margin. A supplier that has calculated the machine can answer in one line. A supplier that cannot answer is quoting from habit or from machine availability, and that is exactly the quote where the tonnage line deserves a second opinion before you approve the tool.
Your Next Step
Tonnage is one line on a quote, but it is the line that decides whether your mold runs flash-free on a sensibly priced press or fights the machine for its whole life. Work the calculation for your part before you approve the tool, and make the supplier show theirs.
Send your STEP file and 2D drawing, the resin grade, the quantities you expect, the key tolerances, the surface finish and your delivery region and timing, and we will return the tonnage calculation with the quote — projected area, factor, margin and press size, in writing. Start at Request a Quote or write to jerry@ckmold.com through the contact page.